Education
Kamuan Rural Ethno-educational Institution
Reconstruction of the Kamuan Rural Ethno-educational Institution, with a deep well and potabilisation plant.
27 works delivered between 2018 and 2024 across 4 countries, with a contracted value of over USD 16,76 M.
5 project(s) with the filters applied
View contract dossier
Education
Reconstruction of the Kamuan Rural Ethno-educational Institution, with a deep well and potabilisation plant.
Education
Construction of the Libardo Lozano Urban School in Pradera, Valle del Cauca.
Education
Design and reconstruction of a rural school in the department of Cauca, handed over fully operational.
Education
Design and construction of a school and education centre, including a deep well and groundwater abstraction system.
Education
Upgrade of a rural school in La Guajira with a water storage system and sanitary installations.
We have the experience and the certifications to deliver social infrastructure to international standards.